How long does liquid screed take to dry?

The drying and curing time of floor screed can vary depending on several factors, such as the type of screed, thickness, humidity and temperature.

The drying time of liquid screed is typically much faster than that of traditional sand and cement screed. This is because liquid screed is designed to be self-compacting, which allows it to spread more evenly and settle more quickly than sand and cement screed.

In general, liquid screed can dry and be ready for foot traffic within 24-48 hours, depending on the depth and environmental conditions like temperature and humidity. It can be ready for flooring installation within 14-28 days, although this can vary depending on the specific type of screed being installed.

On the other hand, traditional sand and cement screed can take several weeks to dry completely, again depending on the depth and environmental conditions.

The faster drying time of liquid screed can offer several advantages, such as reduced project timelines, lower labour costs, and quicker access for other trades on the job site. Additionally, the faster drying time can help to prevent delays and minimise the risk of damage to the screed during the installation process.

It is always recommended to consult with the screed manufacturer or installer for specific drying and curing times for the type of screed being used and the environmental conditions of the project site.