Projects
Lacoste Flagship Store
-
Lacoste’s new flagship store on Regent Street and their second largest store globally.
We installed 1,050m² of Cemfloor Level Plus ultra-thin cementitious liquid screed, bonded and sealed with sand blinded Uzin PE480 epoxy moisture barrier.
Hyde Paradox Hotel
-
Sigma Screed were engaged to work on a £34.3 million prestigious transformation project to reposition 15 Old Bailey as an upper-upscale hotel featuring 110 bedrooms, full-service restaurant and gym.
Over 2,800m² of flow screed over 7 floors, levelling the surfaces ready for a range of luxury floor finishes.
Covertex Factory
-
Commercial project for British fabric designer, extending their warehouse facility in Hainault Business Park.
40m³ of Gyvlon Thermio+ flow screed installed over 700m² of Lewis Deck metal decking.
Hammersmith - Residential Renovation
-
Residential job in Hammersmith. Floor prepped, Ecotherm PIR insulation laid, Warmup underfloor heating installed and Gypsol HTC liquid screed poured in 3 days.
Chelmsford - Residential
-
Residential job in Chelmsford. Floating application of Gypsol HTC high performance liquid screed, designed for superior thermal performance when used in conjunction with UFH systems.
Hythe - New Build Residential
-
New build, residential job in Hythe, Kent. Warmup Clypso underfloor heating system installed and 18.1m³ of Gypsol Classic liquid screed poured over 277m².
Higham - New Build Residential
-
New build, residential job in Higham, Kent. 30m³ of Gyvlon Eco FD rapid drying anhydrite, liquid floor screed poured over 369m². This screed can take footfall in as a little as 24 hours and can be completely dry in 14 days; a fraction of the time it takes standard liquid and traditional screeds.
Ambrosetti Vehicle Facility
-
Sigma Screed were engaged to provide a flooring solution for Ambrosetti’s new state of the art facility in Rochester, Kent which processes over 60,000 vehicles per year. 961m² of subfloor was prepared and 36m³ of Gyvlon Finio, thin section, anhydrite liquid screed installed in only 4 days.
Gillingham - Residential Renovation
-
Residential renovation project in Gillingham, Kent. Floating application of Gypsol Rapide fast drying liquid screed installed over 170m². This screed can take footfall in as a little as 24 hours and can be completely dry in 14 days; a fraction of the time it takes standard liquid and traditional screeds.